Guide

Do you need planning permission for air conditioning?

Planning rules for outdoor units in England, Wales, Scotland and Northern Ireland, including the 2025 and 2026 permitted development changes.

Do you need planning permission for air conditioning?

Short answer: For most houses in England and Wales, an outdoor unit can be fitted under permitted development if it meets size, number and noise conditions: up to 1.5 m³ for a house, no more than two units on a detached house or one on other houses, and a calculated noise level of 37 dB(A) or less at the nearest neighbouring window under MCS 020(a). Listed buildings, flats with more than one unit and pitched-roof installs need permission.

England

Rules changed on 29 May 2025. The old 1 m boundary rule was removed, the size limit for a house rose to 1.5 m³, and detached houses can have up to two units. Units must meet MCS 020(a) noise limits. Blocks of flats are limited to one unit of up to 0.6 m³. Listed buildings and scheduled monuments need permission, as do pitched-roof installs and flat-roof installs within 1 m of the roof edge. The updated rules also cover heat pumps used for cooling, which brings many air-to-air systems within them.

Wales

From 1 June 2026, Welsh rules were brought closely into line with England's: the old 3 m boundary rule was removed, the size limit rose to 1.5 m³, detached homes can have two units, and units must meet MCS 020a noise limits. Listed buildings need consent, and conservation areas have extra restrictions, such as no unit on a wall or roof facing a road.

Scotland and Northern Ireland

Permitted development rights for heat pumps and outdoor units exist in Scotland and Northern Ireland but with their own conditions, and listed buildings and conservation areas are treated more strictly. We check the current rules with you on survey and, where needed, help you contact the local planning authority.

Flats and conservation areas

Blocks of flats are more likely to need planning permission: in England, permitted development allows only one outdoor unit of up to 0.6 m³ on a block of flats. Homes in conservation areas may need permission for units on elevations facing a road. Leaseholders also need freeholder consent. We position outdoor units at the rear or on balconies wherever possible.

Related services

Sources

More guides

Reviewed October 2026. Rules and prices change; check the date and ask us if anything is unclear.

FAQ

Questions we get asked

Does the indoor unit need permission?

No, only external equipment is a planning matter. Listed building consent can still apply to internal works on a listed building.

What is MCS 020(a)?

A calculation method for heat pump noise at the nearest neighbouring door or window. A result of 37 dB(A) or less meets the permitted development condition.

Next step

Ready for a cooler summer and a cheaper winter?

Book a survey, or get a guide price in about a minute with our online tool.

Starting a live chat loads Tawk.to, which sets its own cookies. Cookie policy.

CallGet a quote