London

Air conditioning for period and listed homes in New Malden

Looking for air conditioning for period and listed homes in New Malden? Every job starts with a free survey at your home and a written, fixed quote before anything is fitted.

  • from £2,195Local guide price
  • Usually 1–3 days, after any consentTypical time
  • LondonArea
Air conditioning for period and listed homes in a home
  • Free survey and written quote
  • Refrigerant work by F-gas certified engineers
  • Price fixed in writing
  • England, Scotland, Wales and NI
  • Cools in summer, heats in winter

Air conditioning for period and listed homes in New Malden

If your home in New Malden is Victorian, Edwardian or older, a console or concealed system often works better than a high wall unit. London's dense streets hold heat overnight, so top-floor flats and loft rooms often stay warm long after sunset.

For period homes in New Malden, we look at consoles in place of radiators and ducted units from the loft before anything else. New Malden lies roughly 9 miles from central London, and we cover it as part of London. Coverage includes KT3.

Prices in New Malden

Our London guide price for air conditioning for period and listed homes is £2,195–£10,495 per home, one room upwards, VAT included. That is above the UK middle, mainly because labour and access cost more in London. Quotes move with the length of the pipe run, where the outdoor unit can sit and how much electrical work the job needs. As an example, the Concealed option (ducted unit from a loft or void serving one or two rooms) would typically be £4,545–£7,195 here.

Console

£2,195–£3,245
inc VAT, London guide

Low-level console in place of a radiator, rear outdoor unit.

Balanced choice

Concealed

£4,545–£7,195
inc VAT, London guide

Ducted unit from a loft or void serving one or two rooms.

Mixed

£5,845–£10,495
inc VAT, London guide

Consoles downstairs and ducted upstairs on one system.

Guide prices show VAT at 20%. HMRC treats most fixed air conditioners and air-to-air heat pumps installed in homes as energy-saving materials, zero-rated until 31 March 2027 when we supply and fit them. If your installation qualifies, your quote shows 0% VAT and a lower price. Servicing, repairs, cleaning and controls are charged at 20%.

Listed building consent

For a listed property in New Malden, consent comes first: the council decides on the outdoor unit position, the pipe routes and any change to historic fabric. Conservation areas add their own limits on units facing a road. Since 29 May 2025, England's permitted development rules allow larger outdoor units (up to 1.5 m³) and no longer require a 1 m gap to the boundary, provided the MCS 020(a) noise check is met. Listed buildings and pitched-roof installs still need permission.

The survey

On a survey in New Malden the engineer looks at room size, glazing, the route for pipes and drains, the electrics and where the outdoor unit can sit quietly, then the written quote follows. Surveys in New Malden cover heat gain, pipe routes, electrics, access and noise to the nearest neighbour, so surprises on the day are rare.

What is included

Included as standard in New Malden:

  • Work started only once consent is in place
  • Console or concealed ducted options
  • Pressure test, vacuum and commissioning
  • Careful routes that avoid cornicing and panelling
  • Drawings and product data for consent applications

Nearby

If you are just outside New Malden, we also work in Surbiton (2 miles), Morden (3 miles) and Wimbledon (3 miles). See all services in New Malden or air conditioning for period and listed homes across London.

FAQ

Common questions in New Malden

How much does air conditioning for period and listed homes cost in New Malden?

Our guide range in London is £2,195–£10,495 per home, one room upwards, including VAT. The exact price depends on the rooms, the pipe route and access, and we confirm it in writing after a free survey.

Will the outdoor unit need planning permission in New Malden?

Most houses can have an outdoor unit under permitted development if it meets the size, number and MCS 020(a) noise conditions. Flats and listed buildings usually need permission or consent. We check on survey.

How long does the installation take in New Malden?

Usually 1–3 days, after any consent. We confirm the timing, and any days with no cooling or heating, in your written quote.

Who carries out the work in New Malden?

F-gas certified engineers working for Aircon Installers. Your contract is with S&K Property Investments and Improvement Ltd, which trades as Aircon Installers, and your quote names who will do the work and the F-gas company certificate that covers it.

How soon can you survey in New Malden?

We offer survey dates when you enquire. Early summer is the busiest time, so spring and autumn are the easiest times to book.

Can the outdoor unit go in a lightwell or basement area?

Often, if it has enough airflow and can be serviced. We check this on survey.

Next step

Ready for a cooler summer and a cheaper winter?

Book a survey, or get a guide price in about a minute with our online tool.

Starting a live chat loads Tawk.to, which sets its own cookies. Cookie policy.

CallGet a quote