New build and renovation air conditioning in Coleraine
In Northern Ireland, homes on oil or electric heating can look at air-to-air systems for efficient warmth. First-fix pipework in Coleraine extensions goes in while the joists and studs are open.
For new Coleraine extensions with flat roofs, the outdoor unit position is best agreed against the architect's drawings. Coleraine sits around 27 miles from Derry/Londonderry, inside our County Londonderry area. Coverage includes BT51 and BT52.
Prices in Coleraine
Budget around £365–£795 per indoor position (first fix) including VAT for air conditioning for new builds and renovations in and around Coleraine. Labour rates in Northern Ireland keep this slightly under the national middle. Quotes move with the length of the pipe run, where the outdoor unit can sit and how much electrical work the job needs. For reference, the First and second fix option in Coleraine (complete install priced per room including units) usually comes to about £1,345–£2,695.
First fix only
Pipework and drains to each position for a later install.
First and second fix
Complete install priced per room including units.
Ducted design and build
Concealed ducted system designed into the build.
Guide prices show VAT at 20%. HMRC treats most fixed air conditioners and air-to-air heat pumps installed in homes as energy-saving materials, zero-rated until 31 March 2027 when we supply and fit them. If your installation qualifies, your quote shows 0% VAT and a lower price. Servicing, repairs, cleaning and controls are charged at 20%.
Working with your builder
First-fix work is about coordination, while the outdoor unit follows the normal planning rules for the property.
The survey
Surveys in Coleraine cover heat gain, pipe routes, electrics, access and noise to the nearest neighbour, so surprises on the day are rare. A survey in Coleraine usually takes one to two hours. We measure the rooms, check the walls and the consumer unit, agree the outdoor unit position with you and photograph the pipe routes.
What is included
Here is what is included on every job in Coleraine:
- Nitrogen pressure test and labelled tails
- Design and setting-out with your builder
- Vacuum, charge and commissioning
- Commissioning records for building control files
- First-fix pipework, drains and cables
Nearby
Nearby, we also cover Limavady (13 miles), Ballymena (24 miles) and Magherafelt (26 miles). See all services in Coleraine or new build and renovation air conditioning across County Londonderry.