London

New build and renovation air conditioning in Shepherds Bush

We install air conditioning for new builds and renovations throughout Shepherds Bush, sizing each system to the rooms in front of us and confirming the price in writing after a free survey.

  • from £495Local guide price
  • First fix 1–2 days, second fix 1–3 daysTypical time
  • LondonArea
New build and renovation air conditioning in a home
  • Free survey and written quote
  • Refrigerant work by F-gas certified engineers
  • Price fixed in writing
  • England, Scotland, Wales and NI
  • Cools in summer, heats in winter

New build and renovation air conditioning in Shepherds Bush

London's dense streets hold heat overnight, so top-floor flats and loft rooms often stay warm long after sunset. For new Shepherds Bush extensions with flat roofs, the outdoor unit position is best agreed against the architect's drawings.

Renovations in Shepherds Bush are the easiest jobs to make invisible, because the pipework goes in before the plaster. Shepherds Bush sits around 4 miles from central London, inside our London area. Homes in W12 are all within our coverage.

Prices in Shepherds Bush

Our London guide price for air conditioning for new builds and renovations is £495–£1,195 per indoor position (first fix), VAT included. Prices here sit above the national middle, reflecting London labour rates and parking and access costs. Longer or hidden pipe runs, high-level brackets and electrical upgrades are the usual reasons a quote lands at the top of the range. On our London figures, the First and second fix option (complete install priced per room including units) is about £1,895–£3,895.

First fix only

£495–£1,195
inc VAT, London guide

Pipework and drains to each position for a later install.

Balanced choice

First and second fix

£1,895–£3,895
inc VAT, London guide

Complete install priced per room including units.

Ducted design and build

£7,195–£17,095
inc VAT, London guide

Concealed ducted system designed into the build.

Guide prices show VAT at 20%. HMRC treats most fixed air conditioners and air-to-air heat pumps installed in homes as energy-saving materials, zero-rated until 31 March 2027 when we supply and fit them. If your installation qualifies, your quote shows 0% VAT and a lower price. Servicing, repairs, cleaning and controls are charged at 20%.

Working with your builder

On build projects the main thing is timing with your builder and electrician; we fit first-fix pipework before plastering and agree the outdoor unit position early.

The survey

On a survey in Shepherds Bush the engineer looks at room size, glazing, the route for pipes and drains, the electrics and where the outdoor unit can sit quietly, then the written quote follows. A survey in Shepherds Bush usually takes one to two hours. We measure the rooms, check the walls and the consumer unit, agree the outdoor unit position with you and photograph the pipe routes.

What is included

What a job in Shepherds Bush covers:

  • Vacuum, charge and commissioning
  • Nitrogen pressure test and labelled tails
  • Second-fix unit installation
  • Commissioning records for building control files
  • First-fix pipework, drains and cables

Nearby

Nearby, we also cover Notting Hill (under a mile), Chiswick (2 miles) and Fulham (2 miles). See all services in Shepherds Bush or new build and renovation air conditioning across London.

FAQ

Common questions in Shepherds Bush

Do you cover all of Shepherds Bush?

Yes, including W12. We also cover nearby Notting Hill and Chiswick.

Is the survey in Shepherds Bush really free?

Yes, for new installations. The survey and written quote are free and there is no obligation to go ahead.

Can I get a price for Shepherds Bush without a visit?

Yes, our online guide price tool gives a range in about a minute. A fixed price needs a survey, which is free for new installations.

How soon can you survey in Shepherds Bush?

We offer survey dates when you enquire. Early summer is the busiest time, so spring and autumn are the easiest times to book.

When should I book air conditioning in a renovation?

Before plastering. Ideally at design stage, so ceiling voids and bulkheads can be planned for ducted units.

Next step

Ready for a cooler summer and a cheaper winter?

Book a survey, or get a guide price in about a minute with our online tool.

Starting a live chat loads Tawk.to, which sets its own cookies. Cookie policy.

CallGet a quote