London

New build and renovation air conditioning in Romford

From the centre of Romford out towards Hornchurch, we design and install air conditioning for new builds and renovations, with a free survey and a fixed written price.

  • from £495Local guide price
  • First fix 1–2 days, second fix 1–3 daysTypical time
  • LondonArea
New build and renovation air conditioning in a home
  • Free survey and written quote
  • Refrigerant work by F-gas certified engineers
  • Price fixed in writing
  • England, Scotland, Wales and NI
  • Cools in summer, heats in winter

New build and renovation air conditioning in Romford

For new Romford extensions with flat roofs, the outdoor unit position is best agreed against the architect's drawings. In London, heat soaks into brick and concrete during the day and comes back out at night, which is when it is hardest to sleep.

Renovations in Romford are the easiest jobs to make invisible, because the pipework goes in before the plaster. Romford is about 14 miles from central London and falls within our London coverage. Coverage includes RM1.

Prices in Romford

In London, our guide range for air conditioning for new builds and renovations is £495–£1,195 per indoor position (first fix), including VAT. Prices here sit above the national middle, reflecting London labour rates and parking and access costs. Longer or hidden pipe runs, high-level brackets and electrical upgrades are the usual reasons a quote lands at the top of the range. For reference, the First and second fix option in Romford (complete install priced per room including units) usually comes to about £1,895–£3,895.

First fix only

£495–£1,195
inc VAT, London guide

Pipework and drains to each position for a later install.

Balanced choice

First and second fix

£1,895–£3,895
inc VAT, London guide

Complete install priced per room including units.

Ducted design and build

£7,195–£17,095
inc VAT, London guide

Concealed ducted system designed into the build.

Guide prices show VAT at 20%. HMRC treats most fixed air conditioners and air-to-air heat pumps installed in homes as energy-saving materials, zero-rated until 31 March 2027 when we supply and fit them. If your installation qualifies, your quote shows 0% VAT and a lower price. Servicing, repairs, cleaning and controls are charged at 20%.

Working with your builder

Because the pipework is built into the structure, coordination with your builder matters more than planning here; the outdoor unit follows the same rules as any other installation.

The survey

A survey in Romford usually takes one to two hours. We measure the rooms, check the walls and the consumer unit, agree the outdoor unit position with you and photograph the pipe routes. At the survey we look at how each room is used, where the sun hits it and how the pipes can reach the outside wall, then put it all in a written quote.

What is included

Here is what is included on every job in Romford:

  • Second-fix unit installation
  • Nitrogen pressure test and labelled tails
  • Commissioning records for building control files
  • Design and setting-out with your builder
  • Vacuum, charge and commissioning

Nearby

Close to Romford, our coverage also includes Hornchurch (2 miles), Dagenham (2 miles) and Becontree (3 miles). See all services in Romford or new build and renovation air conditioning across London.

FAQ

Common questions in Romford

How long does the installation take in Romford?

First fix 1–2 days, second fix 1–3 days. We confirm the timing, and any days with no cooling or heating, in your written quote.

Do you cover all of Romford?

Yes, including RM1. We also cover nearby Hornchurch and Dagenham.

How soon can you survey in Romford?

We offer survey dates when you enquire. Early summer is the busiest time, so spring and autumn are the easiest times to book.

How much does air conditioning for new builds and renovations cost in Romford?

Our guide range in London is £495–£1,195 per indoor position (first fix), including VAT. The exact price depends on the rooms, the pipe route and access, and we confirm it in writing after a free survey.

When should I book air conditioning in a renovation?

Before plastering. Ideally at design stage, so ceiling voids and bulkheads can be planned for ducted units.

Next step

Ready for a cooler summer and a cheaper winter?

Book a survey, or get a guide price in about a minute with our online tool.

Starting a live chat loads Tawk.to, which sets its own cookies. Cookie policy.

CallGet a quote