Berkshire

New build and renovation air conditioning in Maidenhead

From the centre of Maidenhead out towards Slough, we design and install air conditioning for new builds and renovations, with a free survey and a fixed written price.

  • from £495Local guide price
  • First fix 1–2 days, second fix 1–3 daysTypical time
  • BerkshireArea
New build and renovation air conditioning in a home
  • Free survey and written quote
  • Refrigerant work by F-gas certified engineers
  • Price fixed in writing
  • England, Scotland, Wales and NI
  • Cools in summer, heats in winter

New build and renovation air conditioning in Maidenhead

In the South East, loft rooms and glazed extensions can climb well above the outside temperature on a sunny afternoon. For new Maidenhead extensions with flat roofs, the outdoor unit position is best agreed against the architect's drawings.

First-fix pipework in Maidenhead extensions goes in while the joists and studs are open. We cover Maidenhead as part of Berkshire, roughly 12 miles from Reading. Coverage includes SL6.

Prices in Maidenhead

In South East England, our guide range for air conditioning for new builds and renovations is £495–£1,095 per indoor position (first fix), including VAT. Prices here sit above the national middle, reflecting South East England labour rates and parking and access costs. Quotes move with the length of the pipe run, where the outdoor unit can sit and how much electrical work the job needs. On our South East England figures, the First and second fix option (complete install priced per room including units) is about £1,745–£3,595.

First fix only

£495–£1,095
inc VAT, South East England guide

Pipework and drains to each position for a later install.

Balanced choice

First and second fix

£1,745–£3,595
inc VAT, South East England guide

Complete install priced per room including units.

Ducted design and build

£6,645–£15,795
inc VAT, South East England guide

Concealed ducted system designed into the build.

Guide prices show VAT at 20%. HMRC treats most fixed air conditioners and air-to-air heat pumps installed in homes as energy-saving materials, zero-rated until 31 March 2027 when we supply and fit them. If your installation qualifies, your quote shows 0% VAT and a lower price. Servicing, repairs, cleaning and controls are charged at 20%.

Working with your builder

On build projects the main thing is timing with your builder and electrician; we fit first-fix pipework before plastering and agree the outdoor unit position early.

The survey

We book surveys in Maidenhead at a time that suits you, including early evenings by arrangement, and send the written quote afterwards. On a survey in Maidenhead the engineer looks at room size, glazing, the route for pipes and drains, the electrics and where the outdoor unit can sit quietly, then the written quote follows.

What is included

Here is what is included on every job in Maidenhead:

  • Second-fix unit installation
  • Vacuum, charge and commissioning
  • Commissioning records for building control files
  • Design and setting-out with your builder
  • First-fix pipework, drains and cables

Nearby

Nearby, we also cover Slough (5 miles), Windsor (6 miles) and High Wycombe (7 miles). See all services in Maidenhead or new build and renovation air conditioning across Berkshire.

FAQ

Common questions in Maidenhead

How much does air conditioning for new builds and renovations cost in Maidenhead?

Our guide range in South East England is £495–£1,095 per indoor position (first fix), including VAT. The exact price depends on the rooms, the pipe route and access, and we confirm it in writing after a free survey.

Is the survey in Maidenhead really free?

Yes, for new installations. The survey and written quote are free and there is no obligation to go ahead.

How long does the installation take in Maidenhead?

First fix 1–2 days, second fix 1–3 days. We confirm the timing, and any days with no cooling or heating, in your written quote.

Do you cover all of Maidenhead?

Yes, including SL6. We also cover nearby Slough and Windsor.

When should I book air conditioning in a renovation?

Before plastering. Ideally at design stage, so ceiling voids and bulkheads can be planned for ducted units.

Next step

Ready for a cooler summer and a cheaper winter?

Book a survey, or get a guide price in about a minute with our online tool.

Starting a live chat loads Tawk.to, which sets its own cookies. Cookie policy.

CallGet a quote