London

Air conditioning for flats and apartments in Greenwich

Looking for air conditioning for flats and apartments in Greenwich? Every job starts with a free survey at your home and a written, fixed quote before anything is fitted.

  • from £1,795Local guide price
  • Usually 1–2 daysTypical time
  • LondonArea
Air conditioning for flats and apartments in a home
  • Free survey and written quote
  • Refrigerant work by F-gas certified engineers
  • Price fixed in writing
  • England, Scotland, Wales and NI
  • Cools in summer, heats in winter

Air conditioning for flats and apartments in Greenwich

Newer blocks in Greenwich with balconies are often the simplest flats to fit. The urban heat island effect means London bedrooms can stay uncomfortably warm on summer nights.

Balcony-mounted outdoor units are often the neatest solution for flats in Greenwich. Our London coverage takes in Greenwich, about 5 miles from central London. Coverage includes SE10.

Prices in Greenwich

For Greenwich, expect roughly £1,795 to £7,845 per flat, one room to the whole flat, VAT included, adjusted for typical London rates. That is above the UK middle, mainly because labour and access cost more in London. Longer or hidden pipe runs, high-level brackets and electrical upgrades are the usual reasons a quote lands at the top of the range. As an example, the Two rooms option (twin multi-split for living room and main bedroom) would typically be £3,495–£5,195 here.

Single room

£1,795–£2,545
inc VAT, London guide

One wall unit with a balcony outdoor unit.

Balanced choice

Two rooms

£3,495–£5,195
inc VAT, London guide

Twin multi-split for living room and main bedroom.

Whole flat

£4,795–£7,845
inc VAT, London guide

Three or four rooms on one outdoor unit, concealed routes.

Guide prices show VAT at 20%. HMRC treats most fixed air conditioners and air-to-air heat pumps installed in homes as energy-saving materials, zero-rated until 31 March 2027 when we supply and fit them. If your installation qualifies, your quote shows 0% VAT and a lower price. Servicing, repairs, cleaning and controls are charged at 20%.

Consent and planning for flats

For flats in Greenwich, the lease and the freeholder's consent come first. Planning rules for blocks of flats are stricter than for houses, and we check them before quoting. In England, permitted development allows one outdoor unit of up to 0.6 m³ on a block of flats; anything more needs planning permission.

The survey

The free survey is where the real price is set: room measurements, pipe and drain routes, electrical checks and the outdoor unit position, all written into your quote. A survey in Greenwich usually takes one to two hours. We measure the rooms, check the walls and the consumer unit, agree the outdoor unit position with you and photograph the pipe routes.

What is included

Included as standard in Greenwich:

  • Protection of common areas
  • Pressure test, vacuum and commissioning
  • Free survey and lease and consent checklist
  • Single or multi-split system
  • Outdoor unit position agreed with the freeholder

Nearby

If you are just outside Greenwich, we also work in Blackheath (1 mile), Canary Wharf (2 miles) and Catford (2 miles). See all services in Greenwich or air conditioning for flats and apartments across London.

FAQ

Common questions in Greenwich

Will the outdoor unit need planning permission in Greenwich?

Most houses can have an outdoor unit under permitted development if it meets the size, number and MCS 020(a) noise conditions. Flats and listed buildings usually need permission or consent. We check on survey.

How soon can you survey in Greenwich?

We offer survey dates when you enquire. Early summer is the busiest time, so spring and autumn are the easiest times to book.

Can I get a price for Greenwich without a visit?

Yes, our online guide price tool gives a range in about a minute. A fixed price needs a survey, which is free for new installations.

Do you cover all of Greenwich?

Yes, including SE10. We also cover nearby Blackheath and Canary Wharf.

How long does the installation take in Greenwich?

Usually 1–2 days. We confirm the timing, and any days with no cooling or heating, in your written quote.

Do I need my freeholder's permission?

Almost always for anything fixed outside or through an external wall. We can supply drawings and product data for the request.

Next step

Ready for a cooler summer and a cheaper winter?

Book a survey, or get a guide price in about a minute with our online tool.

Starting a live chat loads Tawk.to, which sets its own cookies. Cookie policy.

CallGet a quote